re: The Barn

A couple of completion shots:


Feed area being set up in the tack room.
Nice and clean. Lil Miss installed vinyl tiles.


The concrete work just set. The two 4X4’s are in place to become the support for the wash rack which will tie into the barn at the north wall and have matching metal roof.


Concrete walkway and breezeway; new steps into the tack room, barn doors and stall savers installed. This is the west wall of the barn.


Wash rack area on the north wall.
The walk-in gate is about 16’ north of this and in line with the 10’ X 14’ wash rack.