The first section of our subdivision has been completed a year or so with section two starting I think in the spring. The general contractor keeps a 30’ dumpster in place for all the subs to use. Long story short, between the custom build cabinets, and all the other upgrades people want, I am a dumpster diver. Just tons of beautiful oak, cherry and pine “scraps.” On one occasion I found 4 dark rough cut boards about 8×6×4, turned out to be beautiful walnut. So check those dumpsters.

Jack