Dang Bruce. That sounds really cool. Very organized. I think jim it would take a week to roll and carry my stuff out then a week to wash walls and paint. The epoxy floor might take longer. I would hate to roll them back in and mess up the floor. So id need curing time. So i bet a month to 6 weeks. Now thats with a plan to follow. Lol

Jeff Vandenberg aka "Woodsconsin"