First up on this day was to correct a mistake I made yesterday. When I cut the back rabbet on the top I had the part turned around. I have been ke...
 The next process is to create a second level similar to the first.    A 5/16" straight bit allowed me to leave 1/8" on the outside. [image.png] ...
When I decided to update this blog I realized that this is one of my favorite projects. It has a ton of details crammed into a small project. There...
This box is sized to fit the rattles. I start with the pieces that fit under the lid. After assembly I added a shaped floor to make the box more of...
This blog adds the construction details for a project posting.  The fun thing about this project is that it requires very little materials. This w...
 With the system running correctly, the next step is to reinstall the floor. [image.png] The floor is a set of extrusions. A narrow one goes at th...
  A trip to the hardware store got me the bolts I needed. Reinstalling them was pretty straightforward.    The rails & bearings took a little over ...
The first thing I checked was the motor mount and the anti-backlash nut. To do this I removed the spoil board and the floor. I found a large amount...
  After a few years of research and a bit of shopping I managed to find a used ShopBot Desktop CNC on Ebay. The seller told me it was 4 or 5 years ...
  This last step is pretty straightforward – especially compared to the previous steps. I just need to get a cylinder that looks good.    First I d...
 I had put steps on each side of the outer ring blanks. These steps were to be used to have a reference surface parallel to the trough axis. But af...
 The outer ring is made up of 4 blanks. The first one is shown below. [image.png]   The blank is a rectangle in cross section with a trough cut do...