Indian Pallet timber Credenza #4: Panel work M & T work Dodging the rain work

145
7
Hoorah I actually got a dry day here in Sunny Queensland, well part of that is ...unbelievable weather really annoying for outside activities.

So quick as a flash I finished the Frames.
All done on the table saw and tenoning Jig hence the odd looking half dovetails on the tenons when making the rabbet for the panels.

I had a stop and start block clamped ion the fence and carefully lowered the frames onto the spinning blade to cut the rebates
flipped them around and did the other side then reset the saw to remove the wooden whisker left in the middle.

used my panel door router set for the  three panels.


Started to dry fit them and wouldn't you know it down came the rain again.
So I had to hastily pack up and stop mid way.




Regards Rob

Perfect one day, pissing down the other!

If your first cut is too short... Take the second cut from the longer end... LBD

You better believe it is Melb as bad?

In fact from the 11 May its been no perfect days unless you are a duck!
I even thought about buying an Airfix kit to amuse myself.
Its actually clear Today (Sat) so I have been finishing nail holes.

Regards Rob

The only day it didn't rain here lately, I got a fucking home invasion. 

If your first cut is too short... Take the second cut from the longer end... LBD

Obviously a fair weather crim!
At least I dont have to water the garden

Regards Rob


 RobsCastle
.....
At least I dont have to water the garden
You suffer incontinence... too?

If your first cut is too short... Take the second cut from the longer end... LBD

nitrogen is reported to be good for tomatos!

Regards Rob

I reserve it for the lemon tree.

If your first cut is too short... Take the second cut from the longer end... LBD